Complete Guide to As-Built Drawings: Types, Benefits, & Best Practices

Design changes can cause delays, increase costs, and create coordination issues in construction. Accurate as-built drawings help reduce these problems by providing a clear record of the final construction, including any changes made during the project. These drawings make it easier to manage buildings, plan future renovations, and follow regulations, avoiding unexpected costs and delays.

As-built drawings capture all modifications made during construction, including those driven by site conditions, design changes, or on-the-spot decisions, ensuring that the final structure is accurately reflected. By providing a clear record of these adjustments, as-built drawings help avoid the financial risks associated with design changes and ensure transparency in the construction process.

In this article, you’ll learn about as-built drawings, their types, and key roles in their creation. In addition, you’ll get a step-by-step guide on how to create and manage them, along with practical tips to use these essential documents effectively.

What are As-Built Drawings?

What are As-Built Drawings?

As-built drawings are the final set of plans that show exactly how a building was built. They include any changes made during construction, showing the actual size, materials, and layout of the building.

These drawings are important for future maintenance, repairs, and renovations because they provide a clear and accurate record of the finished building. Engineers, contractors, and building owners use them to see what was changed from the original design.

Although as-built drawings capture the final details of a completed project, they are often compared to record drawings, which serve a slightly different purpose.

Differences Between As-Built Drawings & Record Drawings

When you’re managing construction projects, it’s important to know the difference between as-built drawings and record drawings. As-built drawings show the exact details and measurements of the finished project, while record drawings give a more general idea of the final design.

Knowing the difference between these drawings helps architects and building owners manage the project smoothly and take care of the building in the long run.

Below are the key differences between as-built drawings and record drawings:

AspectsAs-Built DrawingsRecord Drawings
DefinitionDetailed drawings that reflect the final, actual construction of a building, including all changes made during the construction process.Drawings that document the final design intent, showing any changes made during the construction process but without detailing every alteration.
PurposeTo accurately represent the completed project, including any deviations from the original design.To represent the approved design, including changes made during construction, but not as exhaustive as as-built drawings.
Level of DetailHigh level of detail to show actual dimensions, systems, materials, and any modifications made during construction.May have less detail compared to as-built drawings, focusing more on design intent and major changes.
Timing of CreationCreated after construction is completed, once the building is fully finished and all changes are documented.Typically created during or shortly after construction, often as part of the closeout phase, but not after the final project completion.
AccuracyHighly accurate, based on actual measurements and surveys conducted post-construction.Less precise, as they often rely on the original design intent with some post-construction modifications recorded.
Source of InformationBased on surveys and site measurements, reflecting the actual as-constructed conditions.Based on the construction documents with changes noted from the design stage, typically gathered from contractors or engineers.
UsageUsed for future renovations, repairs, or maintenance and essential for compliance and facility management.Used for general reference in case of future projects or repairs but may not provide enough detail for complex changes.
Changes/ModificationsIncludes all changes made during construction, such as material substitutions, layout changes, and system installations.Documents major modifications but may not capture every minor change made during construction.

Knowing how as-built drawings differ from record drawings helps choose the right documentation for a project. Beyond these differences, as-built drawings offer several benefits that make them valuable for construction, maintenance, and future renovations.

Benefits of As-Built Drawings

As-built drawings provide many benefits in both construction and the long-term management of a building. They show the final version of the project, including changes made during construction that differ from the original design.

As-built drawings are a valuable part of the construction process both during and after a project. Some of the main benefits of as-built drawings are:

  • Creating Clear and Accurate Records: As-built drawings provide a reliable record of the actual layout, dimensions, and systems for future reference.
  • Allowing Easier Renovations and Maintenance: These drawings help plan renovations, repairs, or expansions. They show important details like utility locations and structural components that make it easy to assess plans and avoid problems.
  • Ensuring Compliance and Legal Use: As-built drawings help meet building codes and zoning laws. They prove that the project followed approved plans and can be helpful in legal matters or disputes.
  • Better Communication: Engineers, architects, and contractors use as-built drawings to share accurate information. This ensures everyone understands the final structure and avoids confusion.
  • Helping in Building Management: Building owners and facility managers rely on as-built drawings to maintain and operate the property. These records help with repairs, upgrades, and cost-effective maintenance.
  • Allowing Faster Problem-Solving: When issues like plumbing, electrical, or structural problems arise, as-built drawings make it easier to find and fix them quickly by reducing downtime and costs.

Understanding the benefits of as-built drawings highlights their importance in construction and facility management. These drawings come in different types, each serving a specific purpose to document various aspects of a building accurately.

Also read: Importance of Construction Drawings: Types, Details & Regulations.

Types of As-Built Drawings with Examples

Types of As-Built Drawings with Examples

As-built drawings come in different types, and each type serves a specific purpose in recording the final details of a construction project. These drawings help document everything from the building’s structure to its mechanical and electrical systems, ensuring accuracy for future use.

Some common types of as-built drawings with examples are as follows:

  1. Architectural As-Built Drawings

These drawings show the final layout of the building, including walls, doors, windows, and other architectural elements. Examples include floor plans displaying room layouts, hallways, and staircases; elevation drawings showing the building’s exterior; and sectional views illustrating spatial relationships.

  1. Structural As-Built Drawings

These drawings document the structural framework of the building, including foundations, beams, and columns. Examples include drawings showing the exact locations of load-bearing walls, columns, and beams, along with details of foundation depth and materials like steel or concrete.

  1. Mechanical, Electrical, and Plumbing (MEP) As-Built Drawings

These drawings show the final installation of mechanical, electrical, and plumbing systems. Examples include:

  • Mechanical drawings showing HVAC ducts, vents, and air conditioning units.
  • Electrical drawings showing locations of outlets, switches, lighting fixtures, and electrical panels.
  • Plumbing drawings showing the layout of pipes, drains, and water metres.
  1. Civil As-Built Drawings

These drawings record site features such as grading, drainage, roads, and utility connections.  Examples include site plans showing land contours, drainage systems, parking lots, and roads, including modifications made during construction.

  1. Landscape As-Built Drawings

These drawings show the final layout of outdoor spaces, including gardens, pathways, and recreational areas. Examples include plans marking trees, shrubs, walkways, irrigation systems, and outdoor lighting.

  1. Interior Finishes As-Built Drawings

These drawings provide details on flooring, wall finishes, ceilings, and other interior elements. Examples include diagrams showing flooring materials (e.g., tile, wood, carpet), wall finishes, ceiling details, and custom architectural features like mouldings or cabinetry.

  1. Utility As-Built Drawings

These drawings document the final positions of utilities, such as water, gas, electricity, and telecommunications. Examples include plans detailing the routes of water pipes, electrical wiring, sewer lines, and telecom cables, along with connection points.

  1. Fire Protection As-Built Drawings

These drawings show fire safety installations, such as sprinklers, alarms, and emergency exits. Examples include plans showing sprinkler heads, fire alarms, emergency exit routes, and fire-rated doors.

  1. Site As-Built Drawings

These drawings capture the entire construction site layout, including utilities, infrastructure, and landscaping. Examples include site plans showing the exact placement of buildings, roads, pathways, parking lots, and drainage systems.

  1.  Shop As-Built Drawings

These drawings detail custom-built or prefabricated components installed in the project. Examples include fabrication drawings for structural steel frames, metal components, or custom cabinetry made off-site and fitted during construction.

Each type of as-built drawing captures specific details about a building’s structure, systems, or modifications. However, creating these drawings requires careful coordination among different professionals.

Ready to simplify your projects and achieve the benefits?

BIM ASSOCIATES is your one-stop BIM Solution provider for Revit Architectural and Structural Solutions. They coordinate with your team to develop, record, and streamline the BIM Revit Model, along with the sheets, Bill of Quantities, Bill of Materials, and clash coordination.

Roles and Responsibilities in Creating As-Built Drawings

Roles and Responsibilities in Creating As-Built Drawings

Creating as-built drawings is a collaborative process that involves multiple professionals working together to ensure accuracy and completeness. From measuring the site to drafting precise and compliant drawings, each expert plays a vital role in capturing the final details of a construction project.

Below is an overview of the key roles and their responsibilities in creating as-built drawings:

Land Surveyors

Land surveyors take precise measurements of the completed construction to document the actual layout of the building and site. Their responsibilities include:

  • Measuring and inspecting the site to gather accurate data.
  • Recording the final locations of structures, utilities, and systems.
  • Identifying and documenting any changes made during construction.
  • Providing reliable data for creating as-built drawings.

Drafters and CAD Technicians

Drafters and CAD technicians use design software to turn survey data into detailed, scaled drawings. Their responsibilities include:

  • Entering survey data into CAD software to create as-built drawings.
  • Ensuring the drawings are accurate, labelled, and to scale.
  • Including any changes made during construction.
  • Creating different types of drawings, such as architectural, structural, electrical, and plumbing plans.

Architects

Architects review the as-built drawings to ensure they reflect the final design and any approved modifications. Their responsibilities include:

  • Checking the accuracy of the drawings based on the final design.
  • Making sure safety regulations and building codes are followed.
  • Providing feedback and suggesting any necessary corrections.
  • Verifying that design changes are properly documented.

Engineers (Structural, MEPF, Civil)

Engineers ensure that technical details, such as mechanical, electrical, plumbing, Fire (MEPF), and structural components, are correctly included in the as-built drawings. Their responsibilities include:

  • Reviewing and confirming the technical aspects of the drawings.
  • Incorporating any modifications made during construction.
  • Verifying adherence to safety regulations and building codes.
  • Adding necessary details, such as material specifications and system layouts.

Contractors and Construction Managers

Contractors and construction managers oversee the construction and track any changes made to the original design. Their responsibilities include:

  • Keeping records of changes during construction and sharingshare them with the design team.
  • Documenting modifications such as material changes or layout adjustments.
  • Working with surveyors and drafters to update the drawings as needed.
  • Ensuring the final drawings match the actual built structure.

Project Managers

Project managers ensure the as-built documentation is completed and properly stored for future use. Their responsibilities include:

  • Ensuring the as-built drawings are completed on time.
  • Coordinating communication between surveyors, architects, and construction teams.
  • Making sure the final drawings are properly stored and shared with relevant stakeholders.

Each of these roles is important to ensure that as-built drawings correctly show the finished project. These drawings help with future maintenance, renovations, or checks for building rules. To keep them useful and accurate, they should be made carefully and updated regularly.

Creating and Managing As-Built Drawings

Creating and Managing As-Built Drawings

Creating and managing as-built drawings needs a clear and organised process to keep them accurate, consistent, and easy to access. It starts with recording changes on-site as they happen and keeping everything well-documented for future use.

Each step matters to make sure the final drawings are reliable and useful. When managed well, as-built drawings help avoid expensive mistakes, make facility operations smoother, and support future construction work.

To create and manage as-built drawings, follow these steps:

  1. Surveying and Collecting Data

After construction, a surveyor or specialised team measures the finished building and takes note of the layout, utilities, and modifications. Tools like laser scanners, GPS, and 3D imaging ensure precise data collection.

  1. Recording Changes

Throughout construction, adjustments happen due to site conditions, client requests, or technical reasons. Contractors and project managers document changes in materials, dimensions, and layouts to ensure the as-built drawings reflect the actual structure.

  1. Creating the Drawings

Once all data is collected, CAD technicians use software like AutoCAD or Revit to create detailed as-built drawings. These include floor plans, elevations, sections, and system layouts (e.g., electrical, plumbing, structural).

  1. Review and Quality Check

Architects, engineers, or construction managers review the drawings to ensure accuracy. They compare them with the actual building, confirm all updates are included, and check for compliance with industry standards.

  1. Storing Drawings Properly

As-built drawings should be stored digitally and physically for easy access. Cloud-based platforms or BIM systems help track updates and allow collaboration. Version control ensures the latest version is always available and reduces confusion during renovations or repairs.

  1. Keeping Track of Changes (Version Control)

As buildings are renovated or modified, as-built drawings must stay updated. A version control system helps avoid confusion by labelling files with revision dates and version numbers. Digital management ensures easy access to the latest version, while physical copies should have a manual tracking system for updates.

  1. Sharing and Collaboration

As-built drawings are essential for maintenance, renovations, and regulatory compliance. Cloud storage allows stakeholders like facility managers, architects, and contractors to access and update them in real time and improve efficiency.

  1. Supporting Future Projects

Facility managers use as-built drawings to plan maintenance and repairs, while architects and contractors rely on them for renovations or expansions. Accurate records help align new construction with existing structures and prevent costly mistakes.

  1. Ensuring Compliance

As-built drawings help meet local building codes, zoning laws, and safety regulations. They may be required for inspections, permits, and legal documentation, ensuring compliance and smooth project approvals.

While as-built drawings are essential for compliance and future planning, creating them accurately can be challenging.

Challenges & Solutions for Creating Accurate As-Built Drawings

Accurate as-built drawings are important for future renovations, maintenance, and legal compliance. However, many teams face significant obstacles when accurately capturing and documenting these details. To improve accuracy and usability, it’s important to follow the best practices.

Below are the challenges and solutions for creating accurate as-built drawings:

ChallengesSolutions
Difficulty in capturing all construction changesUse a thorough documentation process to track changes during construction.
Lack of coordination among project teamsImprove communication and collaboration among surveyors, architects, engineers, and contractors.
Inaccurate or incomplete data collectionUse modern technology like laser scanning and 3D modelling to collect precise data.
Managing large and complex projectsAdopt digital tools and software (e.g., BIM) to simplify the management of large projects.
Ensuring accuracy in detailed system installationsUtilise specialised tools for capturing and representing mechanical, electrical, and plumbing systems accurately.
Version control and document management issuesEstablish a strong versioning and tracking system for digital drawings, including revision logs.

Overcoming these challenges ensures that as-built drawings are accurate and reliable, but managing them properly is equally important.

Tips for Effective Management and Use of As-Built Drawings

Tips for Effective Management and Use of As-Built Drawings

Creating as-built drawings is just the first step, but proper management is key to keeping them accurate, accessible, and helpful throughout a building’s life. Without a structured system, these drawings can become outdated, misplaced, or misinterpreted, leading to costly mistakes in future modifications.

Here are some key strategies to improve their management and usability:

  • Digitise and Store in One Place: Converting as-built drawings into digital formats like PDFs, DWG, or BIM files makes them easier to access, update, and share. Storing them in a centralised system, such as a cloud platform, ensures that contractors, architects, and facility managers can always access the latest version.
  • Track Updates with Version Control: Every update should be labelled with a version number, date, and brief description. Older versions should be stored for reference, while the latest ones remain easy to find.
  • Make Drawings Easy to Find: A well-organised system should allow users to search by project name, date, or keyword. Cloud storage enables quick access from any location, which is helpful for professionals managing multiple projects.
  • Organise Drawings Clearly: Files should be categorised by building, system (electrical, plumbing, structural), and revision. A consistent naming format like ProjectName_RevisionNumber_Date_Type helps users quickly identify the right document.
  • Use Drawings for Maintenance: Facility managers rely on as-built drawings to locate utilities, understand layouts, and plan repairs. For large buildings, these drawings can be integrated into management systems to track HVAC, electrical, and plumbing systems.
  • Share with the Right People: As-built drawings should be available to contractors, building owners, maintenance teams, and regulatory authorities. Cloud collaboration tools allow multiple users to view, comment, and update drawings in real time, improving teamwork.
  • Ensure Compliance with Regulations: As-built drawings are often required for inspections, permits, and legal matters. Keeping them updated ensures the building meets safety codes and zoning regulations.
  • Update Drawings After Modifications: Renovations or upgrades should be documented in the as-built drawings to keep them accurate. This helps with future projects by providing a reliable reference for planning and construction.
  • Check for Accuracy: Regular reviews by architects and engineers ensure that the drawings match the actual building. Quality checks help prevent errors that could cause issues in future work.
  • Keep Backup Copies: Digital copies should be regularly backed up on secure servers or external storage. Storing them in different formats and locations adds extra security against data loss or cyber threats.

Managing as-built drawings effectively ensures they remain useful throughout a building’s lifecycle. However, you need an accurate record of the built environment before you create these drawings.

What is an As-Built Survey?

What is an As-Built Survey?

An as-built survey is a detailed assessment conducted after construction to record the exact dimensions, location, and condition of a completed building. It captures important details like walls, foundations, and utilities, providing an accurate picture of the final structure.

As-built surveys help create as-built drawings and serve as a clear record of the building’s actual condition. They are helpful for architects, engineers, contractors, facility managers, and building owners by:

  • Keeping an accurate, updated record of the building after construction.
  • Documenting the actual size, location, and condition of all parts, including changes made during construction.
  • Providing a reliable reference for future renovations, expansions, and repairs.

An as-built survey records the precise dimensions of a structure once construction is finished. Depending on the project’s requirements, various types of as-built surveys are conducted to capture specific details and ensure accuracy.

Types of As-Built Surveys

Different types of as-built surveys are used to capture specific details like building structure, utilities, land features, and layout designs. Each survey serves a unique purpose, whether it’s verifying floor plans or mapping underground utilities.

Choosing the right survey type ensures architects, engineers, and facility managers receive accurate information to make informed decisions. The key types of as-built surveys include:

TypesKey Details
Land Survey As-Built SurveyDocuments overall site layout, including boundaries, roads, and grading.
Structural As-Built SurveyCaptures structural elements like foundations, beams, columns, and slabs.
MEP (Mechanical, Electrical, Plumbing) As-Built SurveyRecords mechanical, electrical, and plumbing systems such as HVAC, electrical wiring, and plumbing fixtures.
Building Envelope As-Built SurveyFocuses on the building’s external shell, including walls, windows, and roof.
Interior As-Built SurveyDocuments the interior layout, including walls, doors, and partitions.
Utility As-Built SurveyCaptures the location of underground and overhead utilities like water, gas, and electrical lines.
Site As-Built SurveyFocuses on on-site features like land contours, drainage systems, and external structures.
Architectural As-Built SurveyRecords architectural elements like walls, ceilings, doors, and windows.

Each type of as-built survey serves a specific purpose. Knowing the right time to conduct an as-built survey is just as crucial as selecting the appropriate type, as timing can greatly affect both accuracy and overall project efficiency.

Best Time to Get an As-Built Survey

The best time to do an as-built survey is right after construction is finished but before any big changes, like renovations or repairs. This way, the survey captures the final version of the building, including any adjustments made during construction. An as-built survey is especially useful when performed:

  • After Construction: Records the exact dimensions, layout, and systems before the building is occupied.
  • Before Renovations or Expansions: Helps with planning by providing accurate details about the existing structure.
  • When Buying or Selling Property: Gives a clear picture of the building’s actual condition, including any modifications.
  • For Compliance or Inspections: Helps meet zoning laws and regulatory requirements.
  • For Maintenance and Facility Management: Provides important details about systems like plumbing and electrical, making repairs and upkeep easier.

Knowing the right time to schedule an as-built survey ensures you capture the most accurate and complete data for your project. As technology continues to evolve, the future of as-built surveys is shifting toward more advanced and efficient methods.

The Future Of As-Built Surveys

The future of as-built surveys is shaped by new technologies like 3D scanning, drones, and Building Information Modelling (BIM). These tools make data collection faster and more accurate, reducing errors and improving documentation.

As-built surveys are also becoming more digital and allowing real-time updates and easy information sharing. As the focus on sustainability and smart buildings continues to grow, these surveys will play a key role in maintenance, renovations, and energy efficiency, supporting long-term building management. In addition, the documentation that accompanies as-built surveys is becoming equally essential.

What is As-Built Documentation?

As-built documentation is the final record of a building as it was actually constructed. It includes drawings, reports, and measurements that show any changes made during construction, such as design updates, material changes, or adjustments to the original plans.

These documents provide precise details about the location of structures, plumbing, electrical, and other systems. They are essential for future maintenance, repairs, renovations, and ensuring compliance with regulations.

As-built documentation plays a crucial role for various stakeholders throughout a building’s lifecycle. Understanding who needs this information helps ensure that it is accessible and used effectively in the right contexts.

Who Requires As-Built Documentation?

As-built documentation is valuable for many professionals who work with a building throughout its life. It helps make informed decisions about future upgrades and ensures the building remains functional and safe. The primary users of as-built documentation include:

  • Facility Managers and Building Owners: They use as-built documents to manage and maintain the building. These records help locate plumbing, electrical, and HVAC systems, making repairs and upgrades easier.
  • Contractors and Architects: They rely on as-built records when renovating or expanding a building. Understanding the existing structure ensures new work fits properly and prevents issues.
  • Engineers (Structural, Mechanical, Electrical, and Plumbing): They use these documents to assess a building’s systems. MEP engineers, in particular, need them to understand how mechanical, electrical, and plumbing systems were installed.

As technology improves, making as-built documentation will become even faster and more precise, benefiting building owners, contractors, and facility managers.

BIM Supports GREEN EARTH.

GREEN EARTH.

Conclusion

As-built drawings are essential for managing construction projects successfully. They provide an accurate and up-to-date record of the finished project, making them crucial for future maintenance, renovations, and meeting legal requirements.

To make as-built drawings more effective, it’s important to use modern technology like BIM, laser scanning, and digital tools. Using these technologies ensures that your as-built records are both precise and easy to manage, leading to smoother and more successful projects.

Are you looking for BIM solutions? 

BIM ASSOCIATES is your one-stop BIM Solution provider for the Architecture and Structure discipline. Their solutions help clients with better decision-making, cost-saving, efficient construction planning, and green earth initiatives.

You might also like: 3ds Max for Architectural Design: A Detailed Guide for Beginners.

FAQs (Frequently Asked Questions)

1. What is as-built data?

As-built data is the final set of information about a project after construction is completed. It shows the actual details of the finished project, which may be different from the original plans.

2. What is correct, as-built or as-build?

The correct term is “as-built” because it describes how the project was actually built. These are used in construction, renovations, and maintenance.

3. What is as-built verification?

As-built verification is the process of checking and confirming that a construction project matches the actual built conditions. This includes reviewing materials used, utilities installed, and any differences from the original design.